The Work includes the construction of a new 3 MG AWWA D110, Type 1, pre-stressed concrete reservoir; inlet/outlet valve vault; under drain vault; reservoir inlet, outlet, under drain, drain, overflow, and wash down piping; connections to existing yard piping; temporary piping, electrical and SCADA connections during construction; landscaping, restoration and irrigation; new site electrical service, electrical, instrumentation and controls; testing, disinfection, commissioning and startup. Work includes connecting reservoir and vaults to new power service; surface preparation and painting of new reservoir; excavation, backfill, earthwork; fencing and gates; asphalt access roads and asphalt restoration associated with construction of new facilities.