Specifications include, but are not limited to: This contract will be awarded in four phases. The first two phases will be awarded initially under a single contract. The third and fourth phases will be awarded with an amendment at SLCDPU’s discretion. Phase I is a detailed inspection of the existing conduit between Terminal Reservoir and manway #D73-M6 on the north side of I-80 at the mouth of Parleys Canyon; a total of approximately 2,900LF of pipe. If project funding allows, additional inspection may be added to Phase I, from manway #D73-M6 to manway #D57-M4 at the southern end of Scenic Drive; approximately 2,350LF of pipe. Phase II is a detailed inspection of the existing conduit from approximately 2356 S. Scenic Dr. to Baskin Reservoir; a length of approximately 9,500LF of pipe. These two phases may be conducted concurrently, although the scope and fee must be submitted separately. Phases III and IV are the design phases related to the reaches of conduit in Phases I and II, respectfully. These phases should not be included on the proposal submitted by the consultant, but may be awarded if deemed necessary by the findings of the inspections in Phases I and II. These two phases may be conducted concurrently, although the scope and fee must be submitted separately if authorized by SLCDPU.