Specifications include, but are not limited to: The exterior renovation consists of exterior site improvements and building envelope upgrades to the Construction Trades Building on the Redwood Road Campus of the Salt Lake Community College. Specific scope items include landscaping and site improvements, water proofing, new exterior drainage sump installation, masonry repair work, replacement of all existing entrance systems and window systems with new glazing, window coverings, store front entrance systems and hardware, all glass entrance systems and curtain wall window systems. All existing coiling overhead doors will be removed and replaced along with all existing exterior hollow metal doors. A new entrance vestibule will be constructed on the north side of the building. The existing mechanical duct work within the main corridor will be extended to the new entrance vestibule and new supply diffuser provided. Structural upgrades include repair work to an existing entrance bridge and structural framing for the new entrance vestibule. Exterior electrical upgrades include new light fixtures, light poles and electrical requirements for new exterior door hardware.