Specifications include, but are not limited to: A The LVPS midlife overhaul scope of work shall include the cleaning, disassembly, refurbishment, necessary repairs, minor paint touchups, replacement of the components (as needed to meet the service life requirement for an additional 15 years) and, testing of the LVPS unit. B All work and testing shall be conducted in accordance with IEEE 16 and/or IEC 60287-1. C The overhaul procedure shall be in accordance with the OEM manufacturing/repair processes except where otherwise agreed. D UTA personnel shall be responsible for the removal and installation of the LVPS units and any associated components from the vehicles. E All mounting hardware and fasteners shall also be sourced and fitted by UTA except as otherwise specified below. F To the extent possible design improvements that have been made to the LVPS since UTA originally purchased the SD100 fleet shall be incorporated into the overhauled units (subject to UTA approval). G The Proposer shall provide a description of its recent design and manufacturing experience in providing overhaul services for static converters/inverters on rail transit vehicles including work currently being performed as described in Part 2.03.C.