Specifications include, but are not limited to: Contractor shall demolish and remove all above and below ground debris and appurtenances including but not limited to; the main structures and/or any detached structures, all basements, footings, foundations, floors, porches, private sidewalks and debris of any kind. Contractor shall include the demolition and removal of all parking slabs, ramps or decks, concrete and/or asphalt flatwork, accessory/ detached structures, sheds or garages, trees, underground piping, junk, trash or dead trees which may be present. No debris shall be left or buried on the site. Demolition methods must include a means of controlling dust generated within the Demolition Area. Should these means include the use of water, the rental of an Ogden City water meter and cost of water will be the responsibility of the Contractor. AT NO TIME SHALL CONTRACTOR HOOK INTO A MUNICIPAL WATER SOURCE (HYDRANT) WITHOUT CITY APPROVAL AND THE REQUIRED METER. All removal from this site of debris, rubbish, and other materials resulting from demolition operations must be disposed of in a legal manner. Contractor will remove all trees and plant material. Tree removal shall include completely removing tree stumps. Green recycling is encouraged for all plant material. Excavated areas associated with the removal of all substructures should be backfilled with a well-graded granular material having a maximum size of 2 inches and not more than 15 percent passing a #200 sieve. All earth materials placed in excavated areas should be placed in maximum eight inch loose lifts and densified to an in-place unit weight equal to 95% of the Maximum Laboratory Density as determined by ASTM D 1557-78. Inspections will be required after demolition and prior to backfill.