Specifications include, but are not limited to: The LVPS midlife overhaul scope of work shall include the cleaning, disassembly, refurbishment, necessary repairs, minor paint touchups, replacement of the and, testing of the LVPS unit. components ; B All work and testing shall be conducted in accordance with IEEE 16 and/or IEC 60287-1. C The overhaul procedure shall be in accordance with the OEM manufacturing/repair processes except where otherwise agreed. D UTA personnel shall be responsible for the removal and installation of the LVPS units and any associated components from the vehicles. E All mounting hardware and fasteners shall also be sourced and fitted by UTA except as otherwise specified below. F To the extent possible design improvements that have been made to the LVPS since UTA originally purchased the SD100 fleet shall be incorporated into the overhauled units (subject to UTA approval).