Specifications include, but are not limited to: A1Mobilization and Demobilization Lump Sum$A2Quality Control Lump Sum$A3Construction Surveying Lump Sum$A4Trail Control Signage with Notices Lump Sum$A5Erosion Control Lump Sum$ A6Removal and Proper Disposal of Existing Bridge Structure Including all Associated Tasks, Complete Lump Sum$A7Environmental Requirements –For Bridge Removal to Disposal at an Approved and Authorized Disposal Site, Complete Lump Sum$A8Demolition and Removal of Existing Asphalt Trail, Complete Lump Sum$A9Removal and Proper Disposal of Concrete Storm Drain Pipe, Complete Lump Sum$A10Removal of Existing Gravel Access Road Including Coordination with Rocky Mountain Power and South Valley Water Reclamation Facility, Complete Lump Sum$