Loading...
Skip to main content
< Back to results

Fiber Optic ATMS Maintenance, Repair and Installation (for new vendors)


Location
Utah
Publication Date
03/12/2019 03:55 PM EDT
Closing Date
03/27/2019 01:00 PM EDT
Issuing Organization
State of Utah - Department of Transportation
Solicitation Number
Description

Specifications include, but are not limited to: 1 Traffic Control for Work - Beyond the Shoulder Lump 2 Traffic Control for Work - Shoulder Operation Lump 3 Traffic Control for Work - Single Lane Closure Lump 4 Traffic Control for Work - Two Lane Closure Lump 5 Flagging Hr 6 Detectable Pull Tape placed in Existing Conduit Ft 7 No. 14 Locate Wire placed in Existing Conduit Ft 8 Single 16/13 mm Microduct installed loosely within Existing Conduit Ft

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids