Specifications include, but are not limited to: • Utility bill evaluation and analysis • Basic utility bill analysis and reporting. • Identify rate schedule savings opportunities • Identify demand penalty savings by installing Power Factor Correction • Metering – Permanent or Temporary • Meters can be installed for the following purposes As part of the process of identifying and managing savings opportunities. Alongside PFC, power quality, leading phase angle, harmonic mitigation or other correction devices to measure performance and efficiency, track savings, log data and generate reports and alerts. Load studies or power studies of any kind Neutral load evaluation for current reduction or balancing of panels. To test or verify the effectiveness or efficiency of a transformer, panel, MCC, equipment load(s) or device(s). To identify demand management savings opportunities Troubleshooting or attempting to determine cause of equipment failure Confirm accuracy of utility bill(s). As requested for purposes of facility personnel. • Current transformers (CT’s) of any kind may be installed upgraded or replaced. • Potential transformers (PT’s) of any kind may be installed upgraded or replaced. • Associated cabling/wiring, UPS, surge protection, circuit protection, enclosures, control panels, control equipment, communication equipment, fasteners, hardware, meters, fuses and other necessary equipment may be installed, replaced or upgraded as needed. • Ground resistance metering of panels, transformers and other equipment is offered as an individual service or as part of a more comprehensive study. • Demand Management • Evaluate electrical system and identify additional methods of reducing or eliminating electrical inefficiencies or redundancies. • Identify and predict savings of recommended demand management approaches. • Determination of possible savings, reporting, metering, monitoring, and implementation of removing distributed harmonic correction devices and their associated RLC electrical network and installing a single consolidated mitigation system. • Solar KVAR and demand management o Evaluate power bills and install temporary meter to measure KVAR and KW of electrical service o Create savings profile based on data collected o Recommend device and provide return on investment information. o Install equipment and provide a 5-year warranty with option to rebuild and provide additional 5-year warranty. • Savings from Power Factor Correction and Power Conditioning Correction or brown out reduction or elimination • Install Power Factor Correction with harmonic mitigation for lagging systems. • Leading Phase Angle Correction and Harmonic Mitigation for electronically rich systems. • Installation of zero sequence transformers to fortify and reduce neutral loads. • Installation of grounding transformers