Specifications include, but are not limited to: 1. Snow removal of 34 miles of lanes in Daybreak Subdivisions (see Exhibit A Lane map) a) 8’2” “V” plow entire 18’-wide lanes b) Spread salt in lanes. Pricing to reflect the two options below: 1. Contractor provides ice melt and spreads in lanes with own equipment 2. South Jordan provides ice melt, contractor loads trucks, and spreads in lanes with own equipment. c) Payment will be hourly. Example: 2 drivers = average of 12 hours labor (6 hours x 2 drivers) 2. Estimated hours total: 180 hours per season (not guaranteed) 3. Estimated number of events: 15 storms per season (not guaranteed) 4. Contractor shall be on-site within 1 hour of being contacted by the City of a storm event. GPS tracking will be provided and must be turned on when driver/plow arrives onsite. 5. SD card will be used to track time and location of plowing. Payment is based on this information. 6. Contractor may be required to attend storm review meetings to address any issues or concerns and to coordinate with Daybreak HOA.