Specifications include, but are not limited to: Sweep, Clean Pavement, Furnish and Install Asphalt Seal Coat (2 Coats) and Re-stripe (1 Coat of Paint) Complete 3. Asphalt Patch/Reconstruct Saw Cut Limits, Remove Existing Asphalt, Base, and Native Material to Design Subgrade and Dispose of off-site. Furnish and Install 3” of Compacted Asphalt over 8” of Compacted Road Base, at Design Grades, Complete 4. Asphalt Scratch & Patch Saw Cut Limits Remove Existing Asphalt Surface Course (4”) and Dispose of Off-Site. Proof Roll Subgrade. Furnish and Install 4” of Compacted Hot Mix Asphalt, Complete 5. Remove Concrete Curb And Gutter and Base and Dispose of off-site and Furnish and Install new Concrete Curb and Gutter and Compacted Base, Complete