Specifications include, but are not limited to: Elevator modernization for three hydraulic elevators including all engineering, equipment, labor, and permits as required. State of Utah is requiring this hydraulic elevator modernization project to be a turnkey operation. Hoistway and Pit Paint each pit at the competition of project. Guard open hoistways and entrances during construction per OSHA Regulations. Shield car enclosure, hoistway entrance assemblies, and special metal finishes from damage. Hoistway venting when required. Machine Room Assure a self-closing and locking access door. Repaint machine room floor at the competition of project. Arrange new equipment in the machine room to meet code. Ventilation and heating. Maintain minimum temperature of 55° F, maximum 90° F. Maintain maximum 80% relative humidity, non-condensing Fire sprinklers where required. Class “ABC” fire extinguisher in each elevator machine room.