Specifications include, but are not limited to: 1. REMOVE EXISTING STORAGE TANKS AND INSTALL WATER HEATERS FOR LAUNDRY. a. Demolish Existing Water Storage Tanks Associated Branch Piping Back to Disconnect Laundry and Existing Mixing Valve b. Clear Space to Install Three New Water Heaters (WH - 1,2 & 3) For Laundry Purpose. c. Direct the Existing Domestic Hot Water Boilers on Site (DHW - 1 & 2) To The Mixing Valve To Provide 140°F At Mixing Valve And 115°F At Faucets And Showers. d. See Schedules M601 for WH-1,2 & 3. 2. ADMS-1 & 2 INSTALLATION a. As Per ICRA Plan DMS-1 & 2 Shall Be Installed and be ready to be connected to the Domestic Hot Water (DHW) Supply and Return Lines. b. Downtime for The Showers Shall Not Be More Than 4 Hours. If So, Arrange For Temporary Domestic Hot Water solution for Faucets. c. Provide adequate spacing in the ceiling for maintenance and access of control panel. d. See P803 for plumbing detail. See schedules for M601 proposed DMS installation 3. DHW-1 REPLACEMENT a. Demolish existing boiler DHW-1, replace B-1 and have existing boiler DHW-2 online to provide the required domestic hot water on site. b. Proposed B-1 to be installed and ready to provide hot water to existing mixing valve. c. Install associated peripherals and expansion tank and shall have it approved prior to next phase of construction. 1. Bronze ball valves. 2. Bronze swing check valves. 3. Iron swing check valves. 4. Bronze globe valves. 5. Iron globe valves. 6. Chainwheels.