Specifications include, but are not limited to: 1. Flooring and Adhesive Removal a. Contractor shall remove all floor tile and mastic from the building as shown on the attached site plans (10,725 square feet). These materials contain up to 3% (tile) chrysotile asbestos and 9% chrysotile asbestos (mastic). b. Contractor shall remove floor tiles and associated debris utilizing work practices delineated in OSHA 29 CFR 1926.1101 (g)(7), Work Practices and Engineering Controls for Class II work, and (g)(8), Additional Controls for Class II Work. 2. Textured Ceiling Material and Overspray a. Contractor shall remove 22,401 square feet (and 8,960 square feet of overspray) of textured ceiling material as shown on the attached site plans. This material contains 10% chrysotile asbestos. This material is friable. 3. Spray-on Insulation (Fire proofing) a. Contractor shall remove all fire proofing as shown on the attached site plans. There is approximately 478 square feet of material to be removed; it contains 35% amosite asbestos. This material is friable.