Specifications include, but are not limited to: Pre construction services, with the option to continue in construction pending legislature approval for construction services. The proposed Noorda Building is planned to be developed north of the Engineering Technology Building. Since the existing Technical Education building will be demolished, this allows the ability to tie into and utilize existing utility infrastructure. The existing Technical Education Building will be completely demolished. Extreme caution will be required when demolishing the existing building to not damage any existing utility infrastructure, above and below ground. A large underground concrete tunnel southwest of the existing Technical Education Building contains the majority of the existing utilities. This tunnel is extremely important to the entire Ogden Campus. Also, caution must be taken to protect any existing asphalt parking, concrete sidewalk and curb and surrounding buildings that are not part of this project scope of work.