Specifications include, but are not limited to: 3.5.1 Contractor will remove all trash and legitimate materials that are contained within the bounds of the container from Owner’s property and transport it to an acceptable trash collection facility, including keeping the trash enclosure free of debris and materials. 3.5.2 Contractor will clean up all trash and debris that was contained within the bounds of the container prior to dumping that does not enter the Contractor’s collection vehicle. 3.5.3 Contractor will keep all trash containers in good repair at all times. If a container becomes damaged or broken in any manner, Contractor will repair or replace container, at their sole expense, within a reasonable amount of time not to exceed 30 days. 3.5.4 Contractor will be responsible, at their sole expense, to repair or make whole, any damage to Owner’s or private property as a result of the execution of work while on Owner’s property.