Specifications include, but are not limited to: A. Pre-proposal submittal phase, including: 1. Evaluation of the County’s requirements and of the proposed site for the Project; and 2. Evaluation of federal, state and local requirements and standards, including Farmington City’s form base code, zoning and other requirements relevant to the Project; B. Schematic design phase services for the Project, including: 1. Holding programming meeting(s) to collect complete information regarding desired size, technology focus, function, and aesthetics of space; 2. Developing a construction program and project scope and establishing cost estimates of each desired improvement with the assistance of the County design team; 3. Providing energy modeling for a possible net-zero building; 4. Determining the estimated costs of the desired improvements and in sizing the Project; 5. Presenting schematic design to Farmington City; and 6. Preparing meeting minutes of discussions and direction.