Specifications include, but are not limited to: Work under this Rehabilitation Project will take place within a portion of the City’s 1200 W sewer trunk line located along 1300 S, 800 W and 700 S, from 700 W to Jeremy St. This project shall include work as follows: • Installation of approximately 5,707 feet of Cured-in-Place Pipe (CIPP) within an existing 60-inch Reinforced Concrete Pipe (RCP) sewer trunk line. • Installation of approximately 623 feet of Cured-in-Place Pipe (CIPP) within an existing 8-inch Vitrified Clay Pipe (VCP) sewer main. • Furnishing, installation and uninterrupted maintenance/oversight of a flow control bypass pumping system of the trunk line, including odor control, tributary and sewer service lateral connections present. • Groundwater management as required for CIPP and manhole rehabilitation, including any treatment, handling and disposal in accordance with applicable permits and regulations. • Rehabilitation of 19 manholes/structures with an epoxy coating system (including structure preparation with resurfacer material).