Specifications include, but are not limited to: construction of a water-tight tendon reinforced concrete structure with a 4.0 million gallon capacity; valve vault with piping, valves, etc.; meter vault with connection to existing 66-inch diameter JVWCD steel transmission pipeline, with all piping, valves, etc.; tank inlet/outlet piping; tank emergency overflow piping with boxes and piping; stormwater inlet boxes; site work including: grading, asphalt, fencing, curb and gutter, and landscaping. The project includes electrical work associated with the valve vault and meter vault, connections to and electrical work associated with the valve vault, telemetry wiring, RTU and a Security Camera System. Piping shall include connections to the existing systems. A temporary 12-foot retaining wall will be required at the base of the excavation for the tank along the entire western side of the tank to protect an existing canal located along the western edge of the Bluffdale City property.