Specifications include, but are not limited to: Siding – Horizontal metal siding installed over the top of the existing siding. This includes building wrap, flashing, trim, soffit & fascia, heavy gauge gutters & downspouts, and heat cable on gutters & downspouts. There are State Historic Preservation guidelines that require horizontal siding of a similar reveal to the existing. Also the look of the non-functioning slider doors on the north side of the building needs to be maintained. This includes framing in two 12x12 openings and installing mock doors and sliders on the exterior as a part of the new siding on the building. Signage – Install new UTA Sign, large format building numbers, and garage bay numbers. Coordinate placement with new siding. Entrance – Site build or install prefab entrance vestibule on north side of the building and replace main entrance door.