Specifications include, but are not limited to: 1. Construction and installation of two new PLC back panels to replace existing PLC back panels in Switchgear #1 and Switchgear #2. 2. Construction and installation of a new PLC panel to replace the existing PLC panel in the Influent Pump Station. 3. Demolition work associated with the removal of existing panels, conduit, wire boxes and concrete pads. 4. Electrical work in some locations to install new boxes, conduit and wire. 5. Electrical work in some locations to reroute existing conduit and replace existing wire. 6. Developing a cutover plan that minimizes outages and maximized safety. 1. Working with the Owner and the Owner’s System Integrator for the successful commissioning of a complete and operable system.