Specifications include, but are not limited to: This schedule may include the excavation of approximately 150,000 CY of accumulated debris in Santaquin Debris Basin ; as well as placement of sediment and debris fences and installation of a debris/rockfall barrier system ; Location 2 - consists of re-establishment of approximately 14,000 feet of channel. Placement of streambank protection to include rip rap and fabric. Placement of sediment and debris fences and installation of a debris/rockfall barrier system ; Location 3- This schedule consists of re-establishing the drainage channel in several areas, with an estimated length of 4,800 feet. Stabilization using rip rap, sediment and debris fencing and other means is included in work ; Location 4- This schedule consists of restoring approximately 4,500 feet of existing drainage channel. Portions of the channel will require armoring with rip rap for spring bank protection and installation of a debris/rockfall barrier system (GeoBrugg or similar).