Specifications include, but are not limited to: The project will consist of the construction of a new pipeline from the Alpine Aqueduct North Branch turnout located just north of SR-92 in Highland City to Alpine City's Healey Well. The project will also include a pump station located at the turnout to pump water to Alpine City and to upper zones for future ground water recharge. The pipeline will consist of a short length of 20-inch ductile iron pipe between the turnout location and the new pump station. The pipeline will also include 3,180 feet of new 24-inch ductile iron pipe, including blow-off and air valve assemblies. The pump station will be a concrete structure equipped with four pumps and associated piping, metering, valves, and electrical gear located inside. Outside the pump station will be a new buried surge tank and a small detention basin.