Specifications include, but are not limited to: Schematic design phase to assess the needs and identify the layout, primary elements, and costs of the maintenance building and canopy addition. Design development phase to advance the design and provide a probable construction cost estimate. This phase will also include assisting UTA with obtaining the necessary building permits. Construction documents phase to include the required drawings, specifications, and detailed cost estimate to bid the project to prospective contractors. This phase will also include construction phasing plans as deemed appropriate to maintain operation of maintenance bays. Bidding phase services to include assisting in: advertising of the project for bids, responding to bidder’s questions, preparing clarifications or addenda as required, reviewing the bids, and recommending award of the construction contract. Construction phase services to include attending construction meetings; making period visits to the site to observe the progress and quality of the work to determine if the work is proceeding in accordance with the Contract Documents; consulting with UTA and issuing all instructions to the contractor; reviewing or preparing change orders as required, responding to RFIs; checking and approving samples, shop drawings, tests of material and equipment for compliance with the design concept; conducting substantial and final impactions of the project; and preparation of as-built drawings and any other services identified by the A/E to assist UTA in the construction of the Project.