Specifications include, but are not limited to: 6.1 Conduct all work in a safe and efficient manner. 6.2 Perform utility work in accordance with UDOT Standard Specifications. Contact Blue Stakes prior to commencing work. 6.3 Unless directed otherwise by the State Representative or drawings and specifications, match all new storm drainage patterns and flow-lines to existing storm drainage patterns and flow-lines. In the event curb and gutter is constructed in a place where no curb and gutter existed prior, drainage for the new curb and gutter shall drain into existing drainage paths and facilities. 6.4 Unless otherwise directed by the State Representative, perform all work to meet or exceed the requirements noted in the drawings and specifications. If the work does not meet the requirements shown in the corresponding drawings and specifications, the Contractor, at his own expense, will correct the deficient work. 6.5 Additional certifications may be required in select cities. Any additional certifications will be identified in the Type II solicitation. 6.6 All staff directly working on pedestrian ramps are required to attend a 4-hour pedestrian ramp training session conducted by UDOT Traffic and Safety or from the Local Technical Assistance Program (LTAP). UDOT may require proof of training.