Specifications include, but are not limited to: Replace four existing restrooms with the CXT-type Owner-provided pre-fabricated restrooms according to drawings and specifications. Bid Schedule (which is posted separately) is to be completed and submitted with the bid and bid bond. 1. Install system according to design parameters and final shop drawings. All installation notes shown on the drawings shall be followed. 2. Determine manifold locations before installing tubing. 3. Mount manifolds in previously prepared locations and/or in previously installed cabinets. A. Manifold should be installed as level and plumb as possible. 4. At connections and fittings, use a plastic tubing cutter to ensure square and clean cuts. 5. Tubing shall be dispensed using a suitable uncoiling device. Remove twists prior to securing tubing. Fasten tubing at no more than 3 feet intervals, being careful not to twist the tubing. In thin concrete or gypsum slabs, secure tubing every 2 feet. Use only fasteners supplied or approved by the PEX tubing manufacturer. 6. At time of installation of each loop of tubing, connect the tubing to the correct manifold outlet and record zone area serviced and tubing length for balancing. If manifold is not installed, cap the tubing ends and label the tubing’s loop number along with S for supply and R for return and loop length.