Specifications include, but are not limited to: General construction. The Hunter High addition adds approximately 42,000 sf of teaching space to the west side of the existing building. The new 2-story steel structure will house classrooms, (2) science labs, (1) maker space, a learning stair and miscellaneous support spaces. The new building will connect to the existing building at two existing hallways on the north and south. An additional mid-point connection will be made through existing storage/office space. The exterior design reflects the current school aesthetic with a mixture of brick, EIFS, glass and metal panel. Additionally, a (2) story CMU concessions/storage building will be added to the south end of the existing football field. Site work will be adapted to reconnect major utilities, fire access and pedestrian walks to the new construction.