Specifications include, but are not limited to: Roadway improvements on 600 West include slight widening, curb, gutter, and sidewalk installation, and total pavement reconstruction of the existing roadway from approximately 1200 North to 1500 North. Improvements on 1400 North span from approximately 500 West to 800 West and include widening to 5 lanes, installation of curb, gutter, and sidewalk, railroad crossing reconstruction and intersection signalization, complete pavement reconstruction of the existing roadway, and a 275 cfs capacity stormdrain installation. Included in the project is a portion of a North Logan sewer capacity improvement consisting of 488 lineal feet of 42-inch and 726 lineal feet of 48-inch sewer piping and associated structures buried to depths near 19-feet. There are also significant irrigation system improvements and some minor waterline improvements included in the design.