Specifications include, but are not limited to: Reconstruction of high service pumps facility including concrete foundation slab, instrumentation, motors, and associated piping and valves. 2. Demolish existing and provide new pump station electrical equipment, in accordance with NEC Codes, including; conductors to all wells, switchgear, MCC’s, low and medium voltage wiring and SCADA controls. 3. Demolish existing fluoride system and provide new fluoride system in a new building. 4. Install new building for the electrical equipment to contain MCCs, switchgear, power panels, SCADA panel, security panel and IS communication panel. 5. Paving, grading, fencing, and other miscellaneous yard piping site work as shown in the Plans. 6. Construction Site and Facility Security (during construction) a. On-Site Security Guard: Provide an onsite security guard during performance of the work, as specified in Section 01500. 7. All miscellaneous improvements for a complete in-place facility including all yard maintenance and site security requirements.