Specifications include, but are not limited to: Attend Design Kick-off meeting at Owners facilities. Perform one site visit to become familiar with the project and the current conditions at the Project site. Prepare approximately 70% complete Construction Documents (CD’s), plans and specifications, for LCRA review, scope of design to include: TEMPORARY CONSTRUCTION ROAD: Construct temporary construction road to access the canoe launch and fishing pier with construction equipment. Including clearing and grubbing, adding fill as required to obtain required slope, and providing a flex base road to allow access to the work area ADA PEDESTRIAN SIDEWALK: Localized foundation erosion of the ADA pedestrian sidewalk should be filled with a suitable fill material or a lean concrete fill to reestablish the foundation.