Specifications include, but are not limited to: The State Preservation Board (SPB), is requesting bids from qualified HVAC contractors to provide a Primary Front‐End upgrade at the Bullock Texas State History Museum (TSHM). Upgrade includes installing Tridium N4 Integration of the existing JCI controls system with Metasys integration. Additionally, provide, integrate, and automate Central Plant per specifications in this document. Work is to be performed Monday‐Friday, 9:00 AM to 5:00 PM, with the option to work weekends if scheduled ahead of time. 1. Provide and install (1) New Operator Workstation for Supervisor Software 2. Provide and install (1) N4 Supervisor software and license on new OWS. 3. Provide and install (2) JACE 8100 supervisor controllers for capacity to host all existing points plus any additional VAV/ FPB controllers, replacing the existing NCUs. 4. Provide each Niagara device with a 5‐year software maintenance agreement 5. Provide and install (1) new Input / Output module for each JACE 8100 6. Provide and install TCOMM 4 driver and hardware for integration into chiller network 7. Provide and install new CAT5e network between supervisory controllers, all additional controls wiring / terminations to be included. 8. Bring all existing VAV / FPB controllers in to the new JACE 8100 with complete and comprehensive naming and addressing with operation verification by Facilities operator. 9. Provide comprehensive graphical interface within the new Front‐end. Interface shall not depend on JAVA to load and must be able to be accessed from a mobile device or tablet. 10. Integrate existing floor plan graphics, updates to floor plans to be provided by owner. 11. Provide complete programing of all necessary trends and alarms to all devices with a comprehensive database for management. 12. Provide 16 hours of end user training to be used in multiple sessions as needed by Facilities Operations Staff, training will be scheduled in increments of 2 hours.