Specifications include, but are not limited to: 1. 1 LS Demolition, removal and disposal of all existing pavements, foundations, slabs, brickwork, piping (remove or cap and plug, as required), appurtenances, equipment, sidewalks, curbs, signs, fences, etc., including all materials, hauling & labor 2. 1 LS Clearing and grubbing, including all vegetation, trees, stumps, root balls, throughout the worksite, including stump hole backfill and all materials, hauling & labor 3. 4667 SY 5" concrete pavement, 4000 psi 28-day strength, including joints, steel reinforcement and all materials & labor; complete, in place 4. 101 SY 6" concrete pavement (Driveway), 4000 psi 28-day strength, including joints, steel reinforcement and all materials & labor; complete, in place 5. 645 LF 6" concrete curb (doweled or monolithic to concrete pavement), including all materials & labor; complete, in place 6. 5 EA Concrete curb ramps, including all materials & labor; complete, in place