Specifications include, but are not limited to: Development of a detailed Budget Estimate commencing with the Schematic Design Phase and concluding with the acceptance of the Guaranteed Maximum Price (GMP). Direct participation with the Owner and Architect will be expected during the design process. This will include, but not be limited to, attendance and participation in design meetings to provide guidance on cost impact and constructability. Development of detailed budgets shall be provided, at a minimum, at the conclusion of the Design Development Phase, and at the beginning of the Construction Document Phase along with interim budget updates, analysis, and revisions as warranted by TCCD to ensure that the design stays within the budget. Development of detailed Project Schedules shall be provided, at a minimum, at the conclusion of the Schematic Design Phase and 75% Construction Document Phase along with interim schedule updates, analysis, and revisions as warranted by TCCD. A detailed Project Schedule shall be provided with issuance of the GMP, and a final detailed Project Schedule shall be provided upon acceptance of the GMP.