Specifications include, but are not limited to: Waco S. 26th St. Improvements includes roadway reconstruction, Flint Ave mill and overlay operations, pavement marking application, traffic signal upgrades and water/sanitary sewer replacement. Mill and overlay operations for Flint Ave includes milling 5,162 sy of existing asphalt and placement of approximately 568 tons of asphalt. Roadway reconstruction includes excavation of approximately 9,230 cy of existing asphalt and base material, placement of approximately 5,050 tons of asphalt, installation of a VIVDS traffic signal system, application of approximately 23,975 LF of pavement markings. Sanitary Sewer replacement includes a total of 214 feet of 6” diameter, 684 feet of 8” diameter, 372 feet of 10” diameter, 4,342 feet of 12” diameter, and 815 feet of 15” diameter sanitary sewer to be installed by open trench excavation. In addition, there is a 457 foot of 15” diameter sanitary sewer installed by horizontal auger boring and 518 foot of 15” minimum I.D. HDPE sanitary sewer installed by pipe bursting. The project also includes 466 feet of 8” diameter water line and 3,808 feet of 12” diameter water line, all installed by open trench excavation.