Specifications include, but are not limited to: Solar Panel Equipment & Systems This Proposal establishes pricing for solar panel equipment and systems that can be purchased by participants in the H-GAC Cooperative Purchasing Program (End Users/Members. Covered under this proposal are solar panels and related equipment (modules, batteries, racks, et cetera, with brands and models specified in Response), targeting roof, ground, or any other typical applications, from 2.5 kW to 250 kW. Include single phase and three phase products, with line voltage auto-detection. Installation Services Proposer shall include pricing on installation and related services as well. Such services may be offered as Time & Materials (T&M) labor rates (across Proposers’ service area or broken-out by region), with minimum quantities and blocks of time specified by Proposer, or as fixed-price packages, or the Proposer may propose other methods of its choosing. If offering T&M rates, Proposer shall specify the following for each labor category to be offered: • Labor category with title • Labor rate • Description of labor category in terms of personnel qualifications, or type and level of work to be performed • Time increments available for purchase by category or in summation at Proposers discretion (e.g. per hour, per week, et cetera) • Minimum blocks of time required to be purchased by the End User by category or in summation, at Proposers discretion.