Specifications include, but are not limited to: The Scope of this project is considered Phase II and will include replacement of electrical panels “HS2”, “LS2”, “HS3”, “LS3”, “HS4”, “LS4”, “HS5” and “LS5” (total of 8); installation of LED lighting for hallways and stairwell areas; bathroom lighting, additional circuits for existing receptacles, and modification of circuiting for emergency egress lighting. Existing feeder conduit and wiring is to remain for reuse with new electrical panels (total of 8). Replacement of any electrical panels will require weekend work and all outages must be coordinated with the UT PMCS Project Manager. Temporary power for branch circuits that serve fire alarm Notification Appliance Circuits maybe required if outage is longer than 24 hours