Specifications include, but are not limited to: The purpose of this RFI is to obtain information regarding a formal steel pole inspection program to include, but not be limited to, the items described below: Describe procedures and requirements for pole inspections. ( i.e. List process or steps taken to conduct steel pole inspections.) Describe steel pole inspection criteria. Outline inspection methods for established criteria that will determine the condition of aging steel infrastructure (distribution poles). Develop a risk matrix based on inspection criteria and critical factors; (i.e. Which poles require immediate replacement?) Describe any mitigation techniques or repairs needed that may be used to prevent pole replacement (recommendations). Describe the tool(s) to be utilized to perform the work. Describe what type of process would be utilized to work with CPS Energy to generate concise reports for review.