Specifications include, but are not limited to: 4.1.1.Contractor shall remove four (4) existing in-wall water fountains (see Attachment A for picture of existing water fountain) and shall install in its place four (4) Halsey Taylor in-wall water bottle filling stations provided to the Contractorby TPWD(see Attachment B for picture of new water fountain and see http://www.elkayfiles.com/spec-sheets/hthbgrn8-wf_spec.pdffor product specifications). 4.1.2.Services shall be executedand performedin accordance with and in the specifications as recommended by the manufacturerincluding the grounding of electrical equipment.By not grounding the electrical equipment it can cause an electrical feedback into a fountain, creating an electrolysis which causes a metallic taste. Plastic drain fittings to isolate the fountain and a GFCI protected circuit are required to be performed under the service.4.1.3.Work shall be performed complete with all parts and in accordance with approved practicesand customs in workmanship.All materials replace the water fountains with the water bottle filling stations shall be new, free from defects.4.1.4.Contractor shall patch and paint the drywall around the installed water bottle filling stations in a color agreedupon by TPWD.4.1.5.Contractorshall include tests as manufacturer recommends.