Specifications include, but are not limited to:This work consists of furnishing all necessary equipment, labor, material, and supervision for the demolition of expansion joint and removal of prematurely worn rail and replacement of these items with new rail without an expansion joint. A more detailed description of the existing conditions and repair details are contained in the Brays Bayou Rail Replacement Memo, attached to this scope.Alternative #2 (low risk option, page 4 of 5) is the selected repair for this project. The concrete sections are to be reconstructed per the attached original bridge and track slab drawings, with the exception of the expansion joint, which is to be eliminated at the south abutment on the repaired rail