Specifications include, but are not limited to: 1. Demolition: As indicated on the drawings, but not limited to: a. Remove existing plumbing fixtures. b. Removal of ceiling and lights. c. Removal of selected walls doors and frames. d. Removal of all electrical devices, conduit and wiring. e. Selected removal of all heating, ventilating, and air condition equipment, controls, ductwork, and diffusers. 2. New work: As indicated on the drawings, but not limited to. a. Installation walls, furr-outs, flooring and wall finishes, doors, frames, hardware. b. Install new ceilings, where indicated. c. Install new lighting, conduit wiring, controls/devices. d. Install new heating, ventilating and air conditioning equipment, control, ductwork and delivery devices.