Specifications include, but are not limited to: Route and Design Studies •Provide As-built Plans. •Provide Preliminary Cost Estimate, Project Information and other Documentation. •Provide soil boring logs for inclusion in the final plans, if applicable. •Provide available Environmental Documentation. •Provide Map File, Topographic (Planimetric) Base File and Aerial Photography. •Provide approved traffic data. •Provide DCIS project information. •Provide Design Summary Report. •Provide Value Engineering Report, if available and applicable. Social, Economic and Environmental Studies and Public Involvement •Provide available project development documents, environmental Documentation, schematics, typical sections, public involvement records, etc. •Review and process each necessary environmental and public involvement document prior to letting of the construction contract. •Locate suitable facilities, advertise, and conduct each required public meeting. •Provide designated State representatives for each public meeting. •Provide a court reporter if necessary for public meetings. •Review the information and material developed by the Engineer to be presented at each public meeting or public hearing three weeks before any such event. The State will return review comments to the Engineer two weeks before each such meetings or hearings, if applicable. Right-of-Way Data and Utility •Provide available existing right of way plans for the proposed project location. •Conduct all right-of-way appraisals and acquisitions, if applicable. •Any coordination on approvals required with the General Land Office (GLO) when crossing state owned lands or navigable waters. •If available, Subsurface Utility Engineering (SUE) data and utility ownership/facility data;