Specifications include, but are not limited to:. The Trinity Building, constructed in 1980, is a five-story office building with two levels of parking. Within this building are three (3) Dover Elevators with MCE controllers. This project involves replacing all necessary elevator equipment, excluding controllers, to restore them to prime operating condition. This includes but is not limited to the following equipment and parts: Elevator #1 (Service Elevator)- GD240 Machine and associated parts Elevators #2 & #3 (Passenger Elevators)-GD105 Machine and associated parts New door package on all three elevators Replace call button stations on all lobby levels Replace push button stations in all three cars Ensure all lettering and signage meets ADA codes and requirements