Specifications include, but are not limited to: An existing recreation and community care center that will be demolished. A new 33,141 sq. ft. facility will be built to replace the old facility in the current parking lot. The project is pursuing LEED 2009 NC Gold certification. Other work includes cast-in-place concrete, concrete tilt-up walls, structural steel framing, cold-formed metal framing, metal stairs, membrane roofing, insulation, metal wall panels, aluminum framed entrances and storefront, wood doors, aluminum door frames, overhead coiling doors, door hardware, gypsum board, acoustical panel ceilings, painting, signage, millwork, fire protection specialties, food service equipment, commercial plumbing fixtures, HVAC equipment and ducting, commercial kitchen hoods, electrical interior and exterior lighting, asphalt paving and concrete flat work.