Specifications include, but are not limited to: 1. Excavation (Channel) - 172,000 CY 2. (7) 7'x3' Box Culverts – 80.3 LF 3. Flared Wingwall for (7) 7'x3' Box Culvert – 2 EA 4. Barricades, Signs and Traffic Handling – 6 Mo 5. Preparing ROW – 4.83 Ac 6. Excavation (Special) (For Roads) – 4,502 CY 7. Embankment (Final)(ORD COMP)(TY A) (For Berm) – 3,455 CY 8. Embankment (Final)(ORD COMP)(TY A) (For Roads) – 6,400 CY 9. Subgrade Preparation – 23,355 SY 10. FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH) – 6,488 CY 11. Prime Coat (Multi Option) – 4,148 Gal 12. D-GR HMA(SQ) TY-D PG64-22 – 2,233 TN 13. Conc Pav (Joint Reinf) (6") – 300 SY 14. Conc Curb (Ty I) – 8,328 LF 15. 12" Water Main – 2,981 LF ; 16. 8" Water Main – 1,297 LF 17. 6" Water Main – 65 LF 18. 12"x12" Tapping Sleeve & Valve – 1 Ea.