Specifications include, but are not limited to:The contractor shall provide all materials, labor, equipment and tools necessary to clean repair and restore office building to provide a complete and operational building. CONCRETE: Saw cut concrete per Construction Documents and Specifications for installation of new shower and drain. Repair any damaged areas of concrete floor per Specifications. Polish concrete floor per Specifications. Stain concrete floor per Specifications. WALLS: Demolish portions or walls as noted and drawn in Construction Documents. Install new walls as noted or drawn in Construction Documents. Install new R-13 batt insulation in exterior walls. Install gypsum board per Construction Documents and Specifications. Wall finish to be textured, primed and painted per Construction Documents and Specifications. Install 4” vinyl baseboard along all walls. DOORS: Remove framed openings as indicated on Construction Documents. Install new framed openings and widen existing framed opening for exterior door as indicated on Construction Documents. Install new hollow metal doors and frames as indicated on Construction Documents and per Specifications. CEILING: Remove existing gypsum board ceiling. Remove existing insulation from ceiling. Install new R-19 batt insulation in ceilings. (Field Verify size) Install new gypsum board on ceilings. Ceiling finish to be textured, primed and painted per Construction Documents and Specifications. KITCHEN: Install new kitchen base, wall and full height plastic laminate cabinets with plastic laminate countertops and backsplash per Construction Documents and Specifications. HVAC: Inspect existing air handling system, duct work and heater for damage and mold. Verify existing air handling unit and heater that it is compatible with new outside air conditioning unit. Install new duct supply and air vent grill in storage room as indicated on Construction Documents. Remove existing air vent grills and return air grill and replace with new vent grills. Remove exiting outside Air Conditioning Unit and replace with new 3-ton BTU unit and place on 4” thick concrete AC pad. Relocate Return Air as indicated on Construction Documents. Install new exhaust fan cover over existing wall exhaust fans as indicated on Construction Documents. Remove, replace and relocate existing thermostat as indicated on Construction Documents.