Specifications include, but are not limited to: Hurricane Harvey Repairs and Restoration for Highway 124 Stock Yard Office and Equipment Shed. CONCRETE: Saw cut concrete per Construction Documents and Specifications for installation of new shower and drain. Repair any damaged areas of concrete floor per Specifications. Polish concrete floor per Specifications. Stain concrete floor per Specifications. WALLS: Demolish portions or walls as noted and drawn in Construction Documents. Install new walls as noted or drawn in Construction Documents. Install new R-13 batt insulation in exterior walls. Install gypsum board per Construction Documents and Specifications. Wall finish to be textured, primed and painted per Construction Documents and Specifications. Install 4” vinyl baseboard along all walls. DOORS: Remove framed openings as indicated on Construction Documents. Install new framed openings and widen existing framed opening for exterior door as indicated on Construction Documents. Install new hollow metal doors and frames as indicated on Construction Documents and per Specifications.