Specifications include, but are not limited to: • Logs of all data collected and electronic record filed in applicable to the SH 99 Segments B and C. Document Controls, source of data and comments on applicability to the SH 99 Segments B and C. • Reports on bridge data obtained and documentation of existing bridge foundations. • Summary report of Kick-off meetings. • Written requests and justifications to obtain specific data that may not be readily available or where assistance of the State is required to obtain the data. ; The GEC shall provide to the State: • Log of all pictures and videos including location, date, and description. • Electronic documentation of all field data collected, stored electronically and catalogued. • Field equipment and personnel required to perform assigned field reconnaissance. ; The GEC shall assemble multi-disciplinary teams and hold workshops to review the schematics considering geometric configurations, traffic operations, traffic & revenue, toll feasibility, long-term maintenance accessibility, safety issues, cost effectiveness, and constructability, in order to identify opportunities for potential refinements.