Specifications include, but are not limited to: Providing flooring for Fire Station #1 for the Corpus Christi Fire Department. The Contractor shall provide all materials, tools, equipment, and labor necessary to install an epoxy flooring system with color chips. Square footage of floor is approximately 2,000 square feet. A. Contractor shall remove all existing tile/flooring, wood and rubber baseboard, while taking proper care to avoid damaging unrelated structural components. All debris shall be hauled off and properly disposed. B. Contractor shall work during business hours of 7:00am to 7:00pm Monday – Sunday. When determining labor hours, Contractor must include all hours necessary to get the job completed in their bid. C. Contractor shall inspect the substrate and advise of any issues that would prevent the proper installation of the flooring system. 1. All concrete areas shall be abrasive cleaned. Abrasive cleaning shall be dust free shot-blasting, or dust free grinding, or other method approved by the Contract Administrator. 2. Contractor shall insure that the concrete is free of all paint, sealers, curing agents, oil, grease, moisture, dirt and other contaminants. 3. All methods or materials used shall be compatible and allow for the proper bonding of the flooring components being installed. 4. Bond tests as recommended by the manufacturer of the flooring system shall be conducted in order to assess the condition of the prepared substrate.