Specifications include, but are not limited to: 4.1. Item #1: Services to provide fire lane improvements within zero (0) to fifty (50) feet of the existing fire lane at PMWMA for approximately forty-seven (47) acres. 4.1.1.All snags twelve (12) inches or greater at diameter breast height to be felled to forest floor away from existing fire lane, leaving a stump no greater than three (3) inches higher than the surface of the ground, and pushed in beyond fifty (50) feet of existing fire lane with minimal soil disturbance or damage to livestanding trees. 4.1.2.Awarded Contractor will be provided geographic information system (GIS) shape files of existing fire lanes to be improved. 4.2. Item #2: Services to provide fire lane improvements within fifty (50) to one hundred (100) feet of the existing fire lane at PMWMA for approximately forty-seven (47) acres. 4.2.1.All snags twelve (12) inches or greater at diameter breast height to be felled to forest floor away from existing fire lane. All activities completed with no or minimal soil disturbance or damage to live-standing trees. 4.2.2.Awarded Contractor will be provided geographic information system (GIS) shape files of existing fire lanes to be improved. 4.3. Soil Disturbance: All activities must be complete with no or minimal soil disturbance or damage to live standing trees. All ruts created by equipment shall be filled/repaired by Contractor.