Specifications include, but are not limited to: A. The Contractor shall arrange to have potable drinking water for his employees. B. Water to be used for construction and testing shall be furnished to the Contractor by the Owner under set conditions and charges contained in the Rules and Regulations adopted by the Public Service Board, specified as Instructions to Contractors Requesting Fire Hydrant Meter. The Contractor shall pay for water at the El Paso Water current rate for water used for any water required for retesting the tank due to any failed testing. C. Alternately, water to be used for construction may be obtained by the Contractor. The Contractor is responsible for determining the suitability of the water for his uses.